New Enquiries

0808 175 0987

Existing Customers

01234 771188

Open Mon-Fri 8am - 5pm

a large hybrid heating unit outdoors, situated on a concrete slab beside a brick building. - PJH Co

Northampton University Podiatry Plant Room Upgrade

We were approached by Northampton University to upgrade the plant room for their Podiatry department that is located at Northampton General Hospital. The existing system consisted of two old, inefficient floor-standing gas boilers that needed replacing. They were both faulty and the parts were no longer required which caused issues with the operation of the clinic.  

As a trusted name in the plumbing and heating industry, PJH Co was tasked with providing a reliable, energy-efficient solution for the client

The Challenge

The primary challengewas to design and install a new heating system that would not only meet the department’s heating requirements but also improve energy efficiency and reduce the client’s carbon footprint. The system needed to be reliable, cost-effective and sustainable in the long term.

two men outside working on a hybrid heating system

The Solution 

After careful consideration, the PJH Co team proposed a hybrid heating system that incorporated a gas boiler and a commercial air source heat pump. The specific components of the system included:

  1. Worcester Bosch Condense 7000 WP (50 – 145kW) gas boiler
  2. Worcester Bosch Compress 3000 AWP air to water heat pump
  3. Worcester controls with an outdoor weather compensator

This combination allows the system to prioritise heating the property using the renewable energy source (the air source heat pump) while the gas boiler provides additional heat when necessary.

The outdoor weather compensator is a crucial component of the system too, as it enables the heating to adjust according to the temperature outside. This ensures the system operates at optimal efficiency, reducing energy waste and costs.

Two people from PJH Co stand in front of a boiler in a maintenance room with a laptop placed on top of the boiler. The room is also equipped with various pipes, gauges, and control units.

The Result

By installing this state-of-the-art hybrid heating system, PJH Co has helped Northampton Hospital’s Podiatry department significantly improve its energy efficiency and reduce its carbon footprint. 

Two technicians work on a large air conditioning unit outdoors, situated on a concrete slab beside a brick building.

About PJH

This project showcases our expertise in designing and implementing products that meet our clients’ needs while also prioritising sustainability. As an MCS-accredited business, you can trust us as your low-carbon installers and specialists.

Contact PJH

Need help with your commercial projects? Why not get in contact with PJH today! We are an MCS-accredited business and also offer national solutions to enterprise level clients

Welcome to PJH - PJH Co

Need some expert advice?

Contact our friendly team today!

  • PJH Co Plumbing logo
  • PJH Co Renewables logo
  • PJH Co HVAC logo
  • PJH Co Facilities logo
  • PJH Co Electrical logo
  • PJH Co Carpentry logo

© PJH Co 2024. All Rights Reserved | PJH Co is a registered company in England.

Adtrak Logo
Top

This website uses cookies to enhance your browsing experience and deliver personalised ads. By clicking “Accept All Cookies”, you agree to the storing of cookies on your device to enhance site navigation, analyse site usage, and assist in our marketing efforts.

More Information Accept All Cookies